-
-
- L.E.S. Products Overview
VI High Efficiency Condensing Boilers
VI High Efficiency Condensing Water
Heaters
-
 |
VI
High Efficiency Condensing Boilers are designed and
constructed to 30psi with 100 psi construction optional. These
boiler are primarily intended for reduced temperature close
loop hydronic heating applications and are equipped with high
turndown modulating gas burners. Minimum of four
square feet of heating surface per boiler horsepower. No
minimum flow requirements, no temperature differentail
limitation and of course the L.E.S. five year thermal shock
warranty. VI High Efficiency Condensing
Water Heater are designed and constructed to 100 psi.
These water heaters are primarily intended for domestic and/or
process water heating and are equipped with high turndown
modulating gas burner. Fully hot dipped galvanized with four
front mounted anodes, fully accessible from the front.
Galvanized, lining complies with ASTM-123 B-6 as per ASME
HLW-200. No minimum flow requirements, no temperature
differentail limitation and of course the L.E.S. five year
thermal shock warranty. |
-
-
-
-
 |
The best feature of Scotch Marine and Firebox
boilers are combined to produced a compact and durable wetback
boiler. These three-pass Firetube boilers, designed to fit
thru standard 30" and 36" steel fire door, provide
optimum performance at minimum cost. They feature a proven
water- surrounded cylindrical furnace, ceramic fiber refractory
rated for continuous 2600F duty, easy access to
both heads and furnace via removable doors, and state
-of-the-art-tabulators. Combustion efficiency the 82-83%
range are guaranteed and maximum non-condensing affiances of
83.6% can often be obtained. The absence of short stay bolts
combines with a U-Type flex-joint between furnace and
front tube sheet to minimize thermal stress and consequent "shock"
damage to boilers. Series HF/HW boilers offer exceptional value,
efficiency, reliability, and ease of
installation and maintenance. Elimination of side access trappings
HF/HW boilers permits close spacing and
simplifies installation. Particularly for steam replacement
application, this is an optimum boiler design. |
-
-
 |
Originally, vertical Firetube heating vessels were used primarily as storage-type domestic
water heaters. However, commercial burner improvements
(forced-draft, turbulent-mixed combustion requires reduced
volume and permits increased furnace pressures) and the
development of bent-steel turbulators (30" long
turbulators typically reduce exhaust stack temperatures by
more than 150°F) enabled re-design to simultaneously increase
combustion efficiency and reduce boiler size and cost.
Elimination of thermal stress due to temperature differentials
across heads is inherent in the one-pass vertical construction,
and the cylindrical design permits inexpensive modification to
meet high pressure code requirements. By changing turbulators
to "spinners", stack temperatures can be increased
so that 60-80°F water in heat pump systems can be heated
directly (no mixing valves, etc.). Whether purchased for a new
building or as components of a replacement heating plant, Series
VW boilers minimize floor space requirements and simplify
handling and installation. |
-
 |
Adequate standby
protection, longer system life, reduced noise levels,
multi-use flexibility, space conservation, and ease of moving
boiler modules into place are all important modular heating
plant advantages, but long-term fuel efficiency is the primary
reason for choosing L.E.S. modular boilers over competing
single or dual boiler heating plants. While engineers must
design for maximum load conditions, heating plant
operation under typical load determines practical
efficiency. L.E.S. Series SC Sequencing Control Packages take
advantage of inherently superior modular turndown ratios to
match heating plant output to actual demand during even the
mildest weather. Costly heat loss is eliminated by leaving
unnecessary capacity at room temperature and destructive
cycling of burners and related equipment is minimized by
effective delay timing. Interlock terminals are provided for
common boiler room safety limits and for control and proof of
combustion air. L.E.S. can provide integral heating plant
control (7-Day programming with indoor/outdoor temperature
override, boost, and/or alarm, per specifications) or
terminals (isolating relays optional) for interfacing with new
or existing energy management computers. Complete L.E.S.
Modular Heating Plants, including boiler shells,
burners, pumps, control packages, and boiler feed systems
combine state-of-the-art design with assured component
compatibility and single-supplier responsibility. |
 |
|